Major Project Milestones

Jan 28

Group Major Milestone
Airframe Aircraft Constructed and RTF–No bomb dropper or other payloads in place
Autopilot Talk to Mission Planner, First Autonomous Waypoint Flight
Camera Display analog display on screen over WiFi + Digital Image on On-board Computer
Gimbal Gimbal Constructed and 3D Printed
Communications and Ground Station Establish Communications to Judges Server
Image Processing TBA…Click and follow gimbal control (servo), Shape and Color Recognition???
Systems Integration Define all lines of communication (signals and data types)

Feb 11

Group Major Milestone
General “Lay it all out on the table” communication demonstration
Airframe Aircraft Flown with Autopilot in Place, Aircraft flown with simulated payload (weights)???
Autopilot Get Pixhawk Flying fully autonomous flight with PX4 Firmware and sending states through telemetry port for Odroid.
Camera Be able to zoom camera through on-board computer???
Gimbal Camera mounted on gimbal, gimbal stabilized tuned, ability to point gimbal
Communications and Ground Station Have acquired all hardware (computers, cables, antennas, etc. for ground station???
Image Processing Identify shape, letter, and pixel location of targets; Obtain sample image processing video
Systems Integration All subsystems talking

Feb 25

Group Major Milestone
Airframe Finish and Fly the Plane via R/C
Autopilot Autonomous flight with PX4 firmware
Camera Installed on gimbal and wired up w/ r/c zoom control
Gimbal Installed on airframe with r/c pointing control
Communications and Ground Station Make server multi-threaded, allow for image uploading to judge's server, listen to topics from autopilot
Image Processing Distortion Correction, Color Identification, Orientation of Target, Cropped Image
Systems Integration TBA

March 10

Group Major Milestone
Airframe Work on mounting autopilot, find solution to battery tray and landing gear issues
Autopilot Decide on Autopilot firmware, get installed, configured, and ready to fly on Bixler
Camera See Gimbal
Gimbal Camera and Gimbal ready to mount to the airplane (all mechanical work finalized)
Communications and Ground Station Communicate with Odroid over Ubiquiti rockets, intigrate ROS listener with client
Image Processing Blob, Shape, Letter, Color, Image correction, combined into one package and connected in ROS
Systems Integration TBA

March 18

Group Major Milestone
Airframe TBA
Autopilot Autopilot test flight on Anaconda and getting states to the ground
Camera See Gimbal
Gimbal Camera and Gimbal software done, hardware calibrated and final pre-flight tuning done
Communications and Ground Station Be listening to all necessary states from the aircraft at the required rate
Image Processing Geo-location up and running on Odroid and image correction
Systems Integration It's all system integration at this point

March 24

Group Major Milestone
General Begin Flight Testing with all systems functional
Airframe All systems installed, connected, and power system set up
Autopilot Flying on actual aircraft with payload
Camera see Gimbal
Gimbal Fully functional, and passing all required info to image processing reliably
Communications and Ground Station All required telemetry and images + data to judges server
Image Processing Tuning image processing based on flight tests + Emergent Target, QR Code, Anagram Decoding
Systems Integration It's all system integration at this point

March 31

Group Major Milestone
General Continue Flight Testing and tune and fix problems
Airframe Any necessary modifications made
Autopilot Autopilot well-tuned + progress on auto take-off and landing
Camera see Gimbal
Gimbal Solve any communication or tuning problems
Communications and Ground Station All required telemetry and images + data to judges server
Image Processing More tuning of image processing based on flight tests + Emergent Target, QR Code, Anagram Decoding
Systems Integration It's all system integration at this point

April 7

Polish and fix any major problems in preparation for Mock competition on April 7th
Group Major Milestone
Airframe Mock Competition Final
Autopilot Mock Competition Final
Camera Mock Competition Final
Gimbal Mock Competition Final
Communications and Ground Station Mock Competition Final
Image Processing Mock Competition Final
Systems Integration Mock Competition Final